Tearing down a backyard shed or fence creates more waste than it looks like on paper.
The boards are long. The framing is bulky. The posts may have concrete attached. Old shingles add weight fast.
Choose the right bin before demolition day. It helps you avoid overflow, extra hauling, and disposal problems.
If you are searching for dumpster rental Alliston or planning Alliston construction waste disposal, use this guide to match the bin to the structure.
Quick answer: which bin should you book?
Use this simple rule:
If you are removing one small shed with wood, framing, and light roofing, then a 10-yard bin may be enough.
If you are removing a typical 12' × 10' shed, then a 14-yard bin is the safer choice when the floor, roof, siding, and framing are all included.
If you are removing a 100-foot wood fence, then choose a 14-yard bin if the boards and posts are being loaded whole or only lightly cut.
If you are removing a shed and a 100-foot fence together, then book a 20-yard bin.
If you are removing concrete post footings, a slab, or asphalt, then book a separate 8-yard specialty bin for the heavy material.
Do not judge only by weight. Bulky wood fills a bin quickly. Concrete reaches the weight limit quickly.
What does a typical 12' × 10' shed actually produce?
A typical wood shed can generate approximately:
5–8 cubic yards of loose demolition material
Roughly 0.5–1.0 metric tonne of wood and framing
More if it includes heavy flooring, dense treated lumber, or asphalt shingles
That estimate assumes the shed is dismantled and the panels are broken down. Leaving large wall sections, doors, and roof pieces intact takes up more space.
The concrete is a separate issue.
A concrete pad or thick footing can add hundreds of kilograms without using much bin space. That is why concrete should not be buried under a wood load in a standard construction bin.
Best match for a 12' × 10' shed
10-yard: Suitable for a lighter wood-only shed teardown with compact loading.
14-yard: Better for a complete shed removal with flooring, framing, siding, and bulky pieces.
20-yard: Best if the shed is packed with contents or combined with a fence, deck frame, or other demolition waste.
8-yard: For clean concrete, soil, or asphalt only. Never for the shed wood.
What does a 100-foot fence actually produce?
A typical 100-foot wood privacy fence can create approximately:
4–8 cubic yards of loose wood waste
Roughly 0.5–1.0 metric tonne of boards, rails, and posts
Extra weight from treated posts and attached concrete footings
The result changes depending on the fence height, board spacing, post size, and how tightly you load it.
A fence also creates long, awkward pieces. Ten-foot boards stacked loosely can waste a lot of space. Cutting boards and rails into manageable sections makes a major difference.
Best match for a 100-foot fence
10-yard: Possible for a carefully dismantled fence with boards cut down and concrete removed.
14-yard: The practical choice for most 100-foot wood fence removals.
20-yard: Better if the fence is tall, doubled, heavily treated, or being removed with a shed or deck frame.
8-yard: Only for the clean concrete from the post footings.

Do not mix every demolition material together
Old fence boards, treated lumber, shingles, and concrete may all come from the same project. They should not automatically go into one mixed load.
Different materials follow different disposal streams.
Old fence boards and treated lumber
Put wood demolition waste into a standard household and construction waste bin.
This can include:
Fence boards
Rails
Shed siding
Floor joists
Wall framing
Plywood
Doors
Nails and normal hardware
Treated lumber belongs with the construction waste stream. Do not put it into a clean-fill bin.
Shingle scraps
Shingles are dense and heavy. They also have their own disposal stream.
Book a dedicated 10-yard shingles bin when shingles are a meaningful part of the project.
10-yard shingles bin:Starting at $200 + $110 per tonne
Shingles only
Starting rate varies by postal code
Subject to H.S.T. and the 5% fuel surcharge
Do not use a brush bin for shingles. Do not mix a full roofing load into a wood demolition bin without confirming first.
Concrete post footings
Concrete footings belong in the 8-yard specialty disposal bin.
This bin is:
7' × 14' × 2'
For soil, concrete, and asphalt only
Not for wood, shingles, household waste, or mixed construction debris
Concrete loads must be clean and free of rebar
Current starting rates are:
Clean soil:$300
Concrete or asphalt:$350
A smart setup for a fence removal is often:
Book an 8-yard bin for the concrete footings.
Book a 14-yard or 20-yard bin for the wood fence.
Keep each load clean and easy to process.
That is safer than placing concrete chunks under a wood load and discovering the bin is overweight.
Current Alliston bin sizes and starting rates
These are current starting rates for standard household and construction waste bins. Rates vary by postal code and are subject to H.S.T. plus the 5% fuel surcharge.
The Regular Rate includes:
7-day rental
Delivery
Pickup
Up to 1 metric tonne of disposal
Additional weight at $130 per metric tonne
The All-In Rate includes unlimited disposal for accepted materials.
Choose Regular if the load is light and predictable. Choose All-In if your structure is heavy, the amount of treated lumber is uncertain, or you are combining demolition with other construction waste.
See the complete Services & Pricing information before you book.
Load in the right order: heavy on the bottom
Loading order matters. It protects the bin, creates more usable space, and helps distribute weight.
Follow this sequence:
Keep every item below the top rim. No material should hang over the sides.
⚠️ Never load concrete on top of loose wood. It can shift during transport and create a dangerous, unstable load.
⚠️ Keep sharp nails, screws, and metal points facing down or contained inside other material.
Protect your Alliston driveway
A roll-off bin is heavy. Placement matters.
Tor Bin Rental uses driveway-safe placement methods with protective wood underneath the bin to help protect asphalt, concrete, and interlock.
Before delivery:
Choose a firm, level placement area.
Clear vehicles, trailers, and tools from the access path.
Keep the area away from low branches and overhead wires.
Leave enough room for the truck to approach and place the bin.
Tell us about narrow driveways, slopes, soft ground, or tight corners when booking.
Do not move the bin after delivery.

If you are unsure about access in Alliston, review the Alliston bin rental service area or check the bin rental FAQ.
Your demolition-day timeline
1. Book
Measure the shed or fence. Identify concrete, shingles, and other materials. Then choose the bin.
Book online 24/7. Enter your postal code to see current availability and rates.
2. Deliver
We deliver the bin to your prepared location. Protective wood is placed underneath to help protect the driveway.
3. Load
Load heavy items first. Break down bulky wood. Keep the waste level and below the rim.
4. Pick up and dispose
When the teardown is complete, we pick up the bin and handle disposal through the correct waste stream.

Still deciding between a 10-yard and 20-yard bin?
For more examples involving volume, access, and bulky construction debris, read our 10 Yard vs. 20 Yard dumpster rental comparison.
The short version is simple:
One compact shed: Start with the 10-yard or 14-yard.
One 100-foot fence: Choose the 14-yard in most cases.
Shed plus fence: Choose the 20-yard.
Concrete footings: Add a separate 8-yard specialty bin.
Shingles: Use the dedicated 10-yard shingles bin.
Book the right Alliston bin before demolition starts
Do not wait until the first wall comes down.
Sort the materials. Measure the structure. Separate concrete and shingles from the wood. Then book the right bin for your Alliston project.
➡️ Book your bin online at torbinrental.ca, or email info@torbinrental.ca with your shed or fence dimensions. We will help you confirm the best setup before you swing.